1. The proposed scheme with maps and details of cost.
2. A detailed map showing the proposed treatment at the mouth of Hatfield Brook
3. A diagram showing an outline design of the proposed bund
Information
1. Use of Environment Agency literature
1. Hatfield Brook catchment area.